= Scheduler RPC timing and retry policies = Each scheduler RPC reports results, gets work, or both. The client's '''scheduler RPC policy''' has several components: when to make a scheduler RPC, which project to contact, which scheduling server for that project, how much work to ask for, and what to do if the RPC fails. The scheduler RPC policy has the following goals: * Make as few scheduler RPCs as possible. * Use random exponential backoff if a project's scheduling servers are down (i.e. delay by a random number times 2^N^, where N is the number of unsuccessful attempts). This avoids an RPC storm when the servers come back up. * Eventually re-read a project's master URL file in case its set of schedulers changes. * Report results before or soon after their deadlines. == Resource debt == The client maintains an exponentially-averaged sum of the CPU time it has devoted to each project. The constant EXP_DECAY_RATE determines the decay rate (currently a factor of e every week). Each project is assigned a '''resource debt''', computed as {{{ resource_debt = resource_share / exp_avg_cpu }}} where 'exp_avg_cpu' is the CPU time used recently by the project (exponentially averaged). Resource debt is a measure of how much work the client owes the project, and in general the project with the greatest resource debt is the one from which work should be requested. == Minimum RPC time == The client maintains a '''minimum RPC time''' for each project. This is the earliest time at which a scheduling RPC should be done to that project (if zero, an RPC can be done immediately). The minimum RPC time can be set for various reasons: * Because of a request from the project, i.e. a `` element in a scheduler reply message. * Because RPCs to all of the project's scheduler have failed. An exponential backoff policy is used. * Because one of the project's computations has failed (the application crashed, or a file upload or download failed). An exponential backoff policy is used to prevent a cycle of rapid failures. == Scheduler RPC sessions == Communication with schedulers is organized into '''sessions''', each of which may involve many RPCs. There are two types of sessions: * '''Get-work''' sessions, whose goal is to get a certain amount of work. Results may be reported as a side-effect. * '''Report-result''' sessions, whose goal is to report results. Work may be fetched as a side-effect. The internal logic of scheduler sessions is encapsulated in the class SCHEDULER_OP. This is implemented as a state machine, but its logic expressed as a process might look like: {{{ get_work_session() { while estimated work < high water mark P = project with greatest debt and min_rpc_time < now for each scheduler URL of P attempt an RPC to that URL if no error break if some RPC succeeded P.nrpc_failures = 0 else P.nrpc_failures++ P.min_rpc_time = exponential_backoff(P.min_rpc_failures) if P.nrpc_failures mod MASTER_FETCH_PERIOD = 0 P.fetch_master_flag = true for each project P with P.fetch_master_flag set read and parse master file if error P.nrpc_failures++ P.min_rpc_time = exponential_backoff(P.min_rpc_failures) if got any new scheduler urls P.nrpc_failures = 0 P.min_rpc_time = 0 } report_result_session(project P) { for each scheduler URL of project attempt an RPC to that URL if no error break if some RPC succeeded P.nrpc_failures = 0 else P.nrpc_failures++; P.min_rpc_time = exponential_backoff(P.min_rpc_failures) } }}} The logic for initiating scheduler sessions is embodied in the [ClientLogic scheduler_rpcs->poll()] function. {{{ if a scheduler RPC session is not active if estimated work is less than low-water mark start a get-work session else if some project P has overdue results start a report-result session for P; if P is the project with greatest resource debt, the RPC request should ask for enough work to bring us up to the high-water mark }}}