Changes between Version 36 and Version 37 of ProjectOptions


Ignore:
Timestamp:
Sep 2, 2007, 2:05:05 PM (17 years ago)
Author:
Rytis
Comment:

Comment out note about max_wus_in_progress - fixed in 13101?

Legend:

Unmodified
Added
Removed
Modified
  • ProjectOptions

    v36 v37  
    4141        Maximum results sent per scheduler RPC. Helps prevent hosts with trouble from getting too many results and trashing them. But you should set this large enough so that a host which is only connected to the net at intervals has enough work to keep it occupied in between connections.
    4242 '''max_wus_in_progress'''::
    43         Maximum results in progress per host. Setting this to something (like 2 for instance) will limit the number of results a given host can simultaneously have registered as 'in progress'. You will need to also use 'resend_lost_results' to avoid blocking the host from getting new work if it ever loses track of any its workunits.
     43        Maximum results in progress per host. Setting this to something (like 2 for instance) will limit the number of results a given host can simultaneously have registered as 'in progress'.
     44{{{
     45#!html
     46<!-- You will need to also use 'resend_lost_results' to avoid blocking the host from getting new work if it ever loses track of any its workunits. - Fixed in 13101? -->
     47}}}
    4448 '''min_sendwork_interval'''::
    4549        Minimum number of seconds to wait after sending results to a given host, before new results are sent to the same host. Helps prevent hosts with download or application problems from trashing lots of results by returning lots of error results. But don't set it to be so long that a host goes idle after completing its work, before getting new work.