Changes between Version 34 and Version 35 of ProjectOptions


Ignore:
Timestamp:
Sep 2, 2007, 12:46:20 PM (17 years ago)
Author:
jbk
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • ProjectOptions

    v34 v35  
    4141        Maximum results sent per scheduler RPC. Helps prevent hosts with trouble from getting too many results and trashing them. But you should set this large enough so that a host which is only connected to the net at intervals has enough work to keep it occupied in between connections.
    4242 '''max_wus_in_progress'''::
    43         Maximum results in progress per host.
     43        Maximum results in progress per host. Setting this to something (like 2 for instance) will limit the number of results a given host can simultaneously have registered as 'in progress'. You will need to also use 'resend_lost_results' to avoid blocking the host from getting new work if it ever looses any workunits.
    4444 '''min_sendwork_interval'''::
    4545        Minimum number of seconds to wait after sending results to a given host, before new results are sent to the same host. Helps prevent hosts with download or application problems from trashing lots of results by returning lots of error results. But don't set it to be so long that a host goes idle after completing its work, before getting new work.