Changes between Version 109 and Version 110 of ProjectOptions


Ignore:
Timestamp:
Feb 15, 2011, 2:00:52 PM (13 years ago)
Author:
davea
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • ProjectOptions

    v109 v110  
    6666e.g. if a host is 64-bit, don't send it a 32-bit CPU version if a 64-bit CPU version exists.
    6767Use this option only if you're sure that your 64-bit versions are faster than the 32-bit versions.
     68{{{
     69<report_grace_period>x</report_grace_period>
     70}}}
     71A "grace period" for task reporting.
     72A task is considered time-out (and a new replica generated)
     73if it is not reported by client_deadline + x.
    6874{{{
    6975<workload_sim>0|1</workload_sim>