Simulation 0

Scenario 69
Who Beyond
When 27 Feb 2013
Parameters
Existing jobs only: no
Round-robin only: no
scheduler EDF sim: no
hysteresis work fetch: yes
REC half-life: 864000.000000
Simulation duration: 86400.000000
Time step: 60.000000
Results
wasted fraction 0.000000
Idle fraction 0.495583
Share violation 1.923613
Monotony 0.039110
RPCs per job 0.191983
Output files Summary
Log file
Timeline
Graph of REC
Comments By Beyond (27 Feb 2013):
The ATI Moo WUs had in the real world had just completely run out and then fetched 159. The same thing will happen over and over no after which ATI projects are being run.
By Beyond (27 Feb 2013):
Sorry, meant to type "no matter which ATI projects are chosen".


Copyright © 2024 University of California.
Permission is granted to copy, distribute and/or modify this document under the terms of the GNU Free Documentation License, Version 1.2 or any later version published by the Free Software Foundation.