Scenario | 209 |
Who | wujj123456 |
When | 11 Aug 2024 |
Parameters | Existing jobs only: no Round-robin only: no scheduler EDF sim: no Include empty projects: no REC half-life: 864000.000000 Simulation duration: 86400.000000 Time step: 60.000000 |
Results | wasted fraction 0.000000 Idle fraction 0.058988 Share violation 1.489970 Monotony 0.165594 RPCs per job 0.436170 |
Output files |
Summary
Log file Timeline Graph of REC |
Comments | By wujj123456 (11 Aug 2024): Looks like I need to explicitly set no new work for projects that currently have no work anyway. Please delete this scenario and refer to 210 instead. |