Scenario | 16 |
Who | Jimmy G (BA) |
When | 30 Sep 2011 |
Parameters | Existing jobs only: yes Round-robin only: no scheduler EDF sim: no hysteresis work fetch: yes REC half-life: 864000.000000 Simulation duration: 86400.000000 Time step: 60.000000 |
Results | wasted fraction 0.000000 Idle fraction 1.000000 Share violation 0.024845 Monotony 0.868335 RPCs per job nan |
Output files |
Summary
Log file Timeline Graph of REC |
Comments | By Jimmy G (BA) (30 Sep 2011): SETI Running MilkyWay Running CPDN Suspended |
Copyright © 2025 University of California.
Permission is granted to copy, distribute and/or modify this document
under the terms of the GNU Free Documentation License,
Version 1.2 or any later version published by the Free Software Foundation.