| Creator | additude | 
| When | 24 Feb 2019 | 
| Description | Scheduler interaction between long duration short due date tasks and short duration long due date tasks | 
| Input files | client_state.xml global_prefs.xml global_prefs_override.xml cc_config.xml projects/gene.disi.unitn.it_test/app_config.xml projects/universeathome.pl_universe/app_config.xml | 
| ID Click for details | Who | When | Parameters | Results | Comments | 
|---|---|---|---|---|---|
| 2 | additude | 24 Feb 2019 | Existing jobs only: no
Round-robin only: no
scheduler EDF sim: no
Include empty projects: no
REC half-life: 864000.000000
Simulation duration: 864000.000000
Time step: 60.000000
         | ||
| 1 | additude | 24 Feb 2019 | Existing jobs only: no
Round-robin only: no
scheduler EDF sim: no
Include empty projects: no
REC half-life: 864000.000000
Simulation duration: 864000.000000
Time step: 60.000000
         | ||
| 0 | additude | 24 Feb 2019 | Existing jobs only: no
Round-robin only: no
scheduler EDF sim: no
Include empty projects: no
REC half-life: 864000.000000
Simulation duration: 864000.000000
Time step: 60.000000
         | 
        Copyright © 2025  University of California.
        
Permission is granted to copy, distribute and/or modify this document
        under the terms of the GNU Free Documentation License,
        Version 1.2 or any later version published by the Free Software Foundation.