Creator | Kiska |
When | 21 Feb 2016 |
Description | Checking the deadline, if 100 Generalized Fermat tasks will complete on time. Scheduler decided to grab 100 of these. |
Input files | client_state.xml global_prefs.xml global_prefs_override.xml cc_config.xml |
ID Click for details |
Who | When | Parameters | Results | Comments |
---|---|---|---|---|---|
1 | 17 Jun 2016 | Existing jobs only: no Round-robin only: no scheduler EDF sim: no Include empty projects: no REC half-life: 864000.000000 Simulation duration: 86400.000000 Time step: 60.000000 | |||
0 | Kiska | 21 Feb 2016 | Existing jobs only: no Round-robin only: no scheduler EDF sim: no Include empty projects: no REC half-life: 864000.000000 Simulation duration: 260000.000000 Time step: 60.000000 |
Copyright © 2024 University of California.
Permission is granted to copy, distribute and/or modify this document
under the terms of the GNU Free Documentation License,
Version 1.2 or any later version published by the Free Software Foundation.