Posts by Ned

1) Message boards : Server programs : Prediction? (Message 5058)
Posted 19 Jul 2006 by Ned
Post:
BoincLogX, and add-on for BOINC reports predicted completion times for the various WU's. Right-click the BoincLogX icon in the task bar and select "Show overall view", then expand the various project entries to see the deadlines and estimated finish times. Its not dynamic, any time BOINC recalculates, you have to request the report again to see the new results. Perhaps the author will share his code.

Ned
2) Message boards : Server programs : WU Deadline shorter than "Connect to Network" (Message 4984)
Posted 12 Jul 2006 by Ned
Post:
I already posted to the Tanpaku Forums...

However, I assumed that WU distribution was a BOINC supplied funtion, not a project specific function... From you comment, I'm assuming BOINC supplies the function, but the project supplies input parameters for its execution.

Ned
3) Message boards : Server programs : WU Deadline shorter than "Connect to Network" (Message 4964)
Posted 11 Jul 2006 by Ned
Post:
I just joined Tanpaku this morning. I use a dial-up line where I upload every second or third day... Imagine my consternation when I discovered the deadline for the Tanpaku WU's was just over eight hours...

Please modify your server to not deliver WU's if the "Connect to Network" is LONGER than the WU deadline time AND GIVE US AN ERROR MESSAGE explaining WHY!!!

Ned
4) Message boards : BOINC client : Scheduling Needs Project Out-of-work Flag Kept in Client (Message 2521)
Posted 11 Jan 2006 by Ned
Post:
Bill: "There is no currently available _reliable_ way to detect a dialup
user. The upload/download limits are not _required_ to be set; I would bet
99% of dialup users say "no limit"."
--
I use Einstein as my "home" project... I've set the upload/download limits
a couple of times, and they stay put, so their settings should be an
accurate indicator of dialup for me at least. There must be something that
indicates that they have been manually set so that they don't get modified
by the application with measured rate data.
------

Paul: Basing dial-up connection on upload/download speed is not accurate
either. I could simply have a heavily loaded "always on" connection.
--
Once set manually, it doesn't seem to move... Just set if higher for a DSL
connection.
------

Bill: "But to your specific problem; if you have three projects, and there
is no work ON YOUR HOST for two of them, then regardless of any "out of
work" signals from those two projects, the Client should download your full
cache setting worth of work for the third project. If it is not doing that,
then it may be a bug, rather than a need for a new feature."
--
That indeed was the case. So I guess I'm reporting a bug. Too bad I've
blown away the data required to debug the problem.
------

Bill: This is why the standard recommendation is to suspend such projects,
as that completely removes them from the LTD calculation, or even to
occasionally "reset" them (which resets their debt to zero)."
--
If I had known this, it would have saved me a lot of trouble... I suppose
there is a source for all these "recommendations" that I haven't discovered
yet.
------

Thanks for your responses... Ned
5) Message boards : BOINC client : Scheduling Needs Project Out-of-work Flag Kept in Client (Message 2493)
Posted 10 Jan 2006 by Ned
Post:
Bill,

I am running 5.2.13.

As for dialup, check the general preferences for maximum upload/ download rate and if its less than 4.8 KB/s, assume the connection is dialup.

Don't worry about a project suddenly getting work. If it should happen, have the distribution be recalculated. The worst that could happen is that you have an overload during an allocation period which is short compared to when the WU needs to be processed. It been my experience that if a project doesn't have work, the duration is for a long time, versus 5 minutes or so...

I'll use the "Suspend" command next time, but its still a manual process and you need to do monitoring.

Ned
6) Message boards : BOINC client : Scheduling Needs Project Out-of-work Flag Kept in Client (Message 2475)
Posted 10 Jan 2006 by Ned
Post:
Scheduling Needs Project "Out of Work" Flag Kept in Client

Machine Environment:

- Dial-up manually, three projects, two out of work
- Manual manipulation of Network Activity Flag used to control when network available

One of the stated objectives of the scheduler is to control multiple projects so that if a project is out of work, that the machine will not be idle by processing work for other projects. However that is not working in my experience.

I observed that scheduling would not load queues with enough work for my allocation duration of three days. Instead it would only load less than one third (each project was not equal) amount of work for the project that had work, even though the other two projects had tried to get work and had received negative response from their servers during my connection. The result was my machine sat idle for a long time unless I dialed in multiple times in a day. I finally got so ticked off that I detached the two idle projects from my machine so that I could get a full load of work. (I thought of tripling my work duration, but that would result in excess loading of the queue for single project machines.)

Now someone is going to say that the two projects out of work had a negative work debt (my words) and that is why it wouldn't fill the work queue with work from the only project that did have work... And that's fine for a machine that has a dedicated internet connection that can get work anytime. But for a machine that gets connected for a short time at long intervals, that stratagy doesn't fullfill your continuous work objective (i.e. implemention needs improvement.)

Scheduling needs to divide work queue alotment between projects that have work available for the allocation period. In my example above, it needed to fill my work queue with work from the project that had work for the full three days, not for just one third of that because it didn't take into consideration that the other two projects had no work to give at the time I asked for it. When I detached from the empty projects, scheduling loaded my queue with the correct amount. But I shouldn't have to do that if the design objectives were met. It also means that I have to watch those two projects web sites to see if work is available and attach to the projects again (not good for statistics either).

Ned