1)
Message boards :
BOINC Manager :
scheduler question, I am confused
(Message 10364)
Posted 19 May 2007 by williacs Post: OK I am running 5.4 of the scheduler as that is what is available on the latest debian. Anyway, what I want to do is run my 3 projects differently then it looks like I can. I want to download from one project and complete that task, upload, then go to the next project, download, run, then upload. I don't see a way to set that up. All I am seeing is that it switches between projects every hours, or whatever interval I set. Is there a way to have it complete a WU on a project before going on to the next project? On my old slow PC that would be more effecient that switching so much. |
Copyright © 2024 University of California.
Permission is granted to copy, distribute and/or modify this document
under the terms of the GNU Free Documentation License,
Version 1.2 or any later version published by the Free Software Foundation.