Message boards : Server programs : How to set deadline for results
Message board moderation
Author | Message |
---|---|
Send message Joined: 8 Jul 11 Posts: 3 |
I can't for the life of me find where I should set this for the project. I'd assume the config.xml but the documentation[1] doesn't seem to include any option for this. Can anyone point me in the right direction? Much thanks. 1: http://boinc.berkeley.edu/trac/wiki/ProjectOptions |
Send message Joined: 29 Aug 05 Posts: 15552 |
It's a combination of the work generation (wu.delay_bound) and the backend logic (result.report_deadline = now + wu.delay_bound). But for more precise settings & help, please see the sticky post at the top of this forum. |
Copyright © 2024 University of California.
Permission is granted to copy, distribute and/or modify this document
under the terms of the GNU Free Documentation License,
Version 1.2 or any later version published by the Free Software Foundation.