Send message Joined: 30 Jul 09 Posts: 48 |
I have BONIC V6.10.58, for my Windows 7 PC. How do I change the resources, for (say) 50% each for two projects, to (say) 75%/25%? I use to be able to change these on my PC in Options or Preferences (or somewhere), but I can't seem to find them. John F. |
Send message Joined: 29 Aug 05 Posts: 15487 |
Resource share is set in the Project preferences, on the project's web site. Example given, Einstein@Home project preferences, first option. You could never set these through the manager. |