Message boards : Questions and problems : Command to report results rather that upload/update
Message board moderation
Author | Message |
---|---|
Send message Joined: 29 Jun 08 Posts: 4 |
I was wondering if there is a option to report results using the command line tool in the format as below: --project URL operation Do operation on a project, identified by its master URL. Operations: reset: delete current work and get more; detach: delete current work and don't get more; update: contact scheduling server; suspend: stop work for project; resume: resume work for project; nomorework: finish current work but don't get more; allowmorework: undo nomorework detach_when_done: detach project update: contacts the server but does not force a report on uploaded work units from boincview Sending scheduler request: To fetch work. Requesting 222 seconds of work, reporting 0 completed tasks This seems to be the case even when there are units uploaded but not reported The only option is a manual update from the button menu in boincview. Here you can in one manual operation 1.report tasks 2.update projects 3.get more work when needed I would like to automate this task in linux using crontab ---------------------------------------------- Ross > Perth > Australia |
Send message Joined: 29 Aug 05 Posts: 15567 |
For BOINC 5.8 and above: Completed work is reported at the first of: 1) 24 hours after completion (was Connect every X after completion). 2) 24 hours before report is due. 3) Connect every X before report is due. 4) On a trickle up message (CPDN only so far). 5) On a request for more work. 6) On a manual update. If you truly can't wait, use the <report_results_immediately> option in cc_config.xml. This works in 5.10.45 and above. |
Copyright © 2024 University of California.
Permission is granted to copy, distribute and/or modify this document
under the terms of the GNU Free Documentation License,
Version 1.2 or any later version published by the Free Software Foundation.