Message boards : BOINC Manager : tiying one task to one specific cpu in SMP systems???
Message board moderation
Author | Message |
---|---|
Send message Joined: 8 Mar 07 Posts: 35 |
Hi, I have a core duo 2 cpu, which means two cpu's in the boinc manager. The current version, 5.10.13, is changing tasks between the two cpus all the time. Is there any way of telling the manager to attach one task to one specific cpu, and let the other cpu switch between other tasks? The reason I want to do this is climate prediction. Since this task is quite time consumming, I would like to attach this task to one cpu, so it runs always. And let the other cpu switch between all my other projects. Thanks, Leo |
Send message Joined: 13 Aug 06 Posts: 778 |
That looks like an imaginative solution. If Leo tries this I think he may also need to set cpdn to No new tasks in the Projects tab to avoid getting an extra climate model before the first has finished (if he hasn't already set this). |
Send message Joined: 8 Mar 07 Posts: 35 |
Guys, thanks a lot for the ideas... I'll try them after reading a bit more about those options... Regards, Leo |
Copyright © 2025 University of California.
Permission is granted to copy, distribute and/or modify this document
under the terms of the GNU Free Documentation License,
Version 1.2 or any later version published by the Free Software Foundation.