Message boards : BOINC client : No New Tasks for all projects
Message board moderation
Author | Message |
---|---|
Send message Joined: 30 Aug 05 Posts: 17 |
I need to power off my PC for several days and want to stop downloading new tasks. I know I can set "no new tasks" on each project. Is there a global equivalent? |
Send message Joined: 8 Jan 06 Posts: 448 |
I need to power off my PC for several days and want to stop downloading new tasks. I know I can set "no new tasks" on each project. Is there a global equivalent? NO. Hopefully in the future Boinc will allow selecting more than one line at a time for things like this. |
Send message Joined: 29 Aug 05 Posts: 15585 |
It can be done through Account Managers such as BAM and GridRepublic... |
Send message Joined: 13 Feb 07 Posts: 3 |
Or set Network activity to suspended. |
Send message Joined: 19 Jan 07 Posts: 1179 |
It can be done through Account Managers such as BAM and GridRepublic... It can? I think you can only detach. "No new work" is not an AMS option. |
Send message Joined: 8 Jan 06 Posts: 448 |
Or set Network activity to suspended. Not a good idea if he wants to drain his cache and report the work. |
Send message Joined: 14 Feb 06 Posts: 139 |
It can be done through Account Managers such as BAM and GridRepublic... Agreed. Reno, NV Team: SETI.USA |
Send message Joined: 29 Aug 05 Posts: 15585 |
It can be done through Account Managers such as BAM and GridRepublic... I'll ask Willy. :-) |
Send message Joined: 14 Feb 06 Posts: 139 |
It can be done through Account Managers such as BAM and GridRepublic... I already did here: http://www.boincstats.com/forum/forum_thread.php?id=1446 No announcements on changes about this since then. I'll ask again. Reno, NV Team: SETI.USA |
Send message Joined: 19 Jan 07 Posts: 1179 |
Setting no new work on all projects on a single computer? I can do a little program for that quite quickly. |
Send message Joined: 6 Dec 06 Posts: 118 |
I need to power off my PC for several days and want to stop downloading new tasks. I know I can set "no new tasks" on each project. Is there a global equivalent? BoincView has the ability to do this on both local and remote machines. |
Send message Joined: 30 Aug 05 Posts: 17 |
I need to power off my PC for several days and want to stop downloading new tasks. I know I can set "no new tasks" on each project. Is there a global equivalent? I have boincview installed on this machine but didn't think to look for this feature. Thanks for the pointer.. |
Copyright © 2025 University of California.
Permission is granted to copy, distribute and/or modify this document
under the terms of the GNU Free Documentation License,
Version 1.2 or any later version published by the Free Software Foundation.