| log in |
| Scenario | 20 |
| Who | David Anderson |
| When | 19 Oct 2011 |
| Parameters | Existing jobs only: no Round-robin only: no scheduler EDF sim: no hysteresis work fetch: yes REC half-life: 864000.000000 Simulation duration: 86400.000000 Time step: 60.000000 |
| Results | wasted fraction 0.000000 Idle fraction 0.000000 Share violation 1.288591 Monotony 0.259859 RPCs per job 0.317204 |
| Output files |
Summary
Log file Timeline Graph of REC |
Copyright © 2013 University of California. Permission is granted to copy, distribute and/or modify this document under the terms of the GNU Free Documentation License, Version 1.2 or any later version published by the Free Software Foundation.