Scenario 25

Creator Ageless
When 22 Oct 2011
Description Another high priority test; Malaria and LHC 1.0
Input files client_state.xml
global_prefs.xml
global_prefs_override.xml
cc_config.xml
Do new simulation

Simulations

ID
Click for details
Who When Parameters Results Comments
1 Ageless 22 Oct 2011
Existing jobs only: no
Round-robin only: no
scheduler EDF sim: no
hysteresis work fetch: yes
REC half-life: 864000.000000
Simulation duration: 115200.000000
Time step: 60.000000

        
wasted fraction 0.000000
Idle fraction 0.000000
Share violation 1.476719
Monotony 0.209790
RPCs per job 0.053846

        
0 Ageless 22 Oct 2011
Existing jobs only: no
Round-robin only: no
scheduler EDF sim: no
hysteresis work fetch: yes
REC half-life: 864000.000000
Simulation duration: 129600.000000
Time step: 60.000000

        
wasted fraction 0.000000
Idle fraction 0.000000
Share violation 1.476719
Monotony 0.209790
RPCs per job 0.053846

        

Copyright © 2017 University of California. Permission is granted to copy, distribute and/or modify this document under the terms of the GNU Free Documentation License, Version 1.2 or any later version published by the Free Software Foundation.